Paulo's Garage PAULOSGARAGE.COM
← Explore all videos on the interactive portal

Preventive Engine Maintenance - AP 1.6 Gol Power - Part 6/6

2017-07-22 · 29:50 · 2,525 views

Video by Paulo — Paulo's Garage.

🔊 Original Workshop Audio in Portuguese
Click the [CC] icon on the player to turn on subtitles. If English subtitles do not appear automatically, click Settings ⚙️ → Subtitles → Auto-translate → English.
All torque specifications, tools, replaced parts, and step-by-step procedures are fully translated in the technical table below.

Concludes the preventive maintenance on the AP 1.6 engine in part six with final assemblies and checks. It also consolidates the results of the entire series in the final running of the Gol

⚡ Tightening Torques & Specifications

Component Specified Torque Assembly Notes
spark plug Especificação da tabela NGK Iridium para velas usadas com assento plano (gaxeta). Paulo usou 2,5 kgf·m. Velas novas iridium: método por ângulo (1/16 de volta após assentamento + 2/3 de volta).

Tools used

Parts mentioned / replaced