Preventive Maintenance - Gol Power 2003 1.6 - 1/3 - [4K]
Preventive maintenance begins on the Gol Power 1.6 in the first of three parts, opening the general maintenance plan. It also organizes the tasks addressing the engine and peripherals throughout the series.
Tools used
- air compressor
- brush
- detail brush
- water hose (jet spray)
Parts mentioned / replaced
- ignition distributor
- distributor rotor
- spark plug
- timing belt
- power steering fluid reservoir
- hose clamp
- sealing ring (reservoir cap rubber gasket)
- brake booster
- intake manifold
- clutch fork
- valve cover
- throttle body (TBI)
- battery
- Fiamm horn
- engine hoses